The challenge
JAZ first negotiated a two-year rooftop lease from Contract Services on behalf of the client. The parking structure’s seven-foot-one-inch clearance prevented normal production trucks, forklifts, and a 20-foot broadcast container from reaching the fifth level.
A 100-ton crane was required near Burbank Airport, bringing FAA coordination and NOTAM requirements. The venue also needed broadcast control, 10-gigabit networking, event sound, theatrical power, lighting, hospitality, VIP, and sponsor areas without permanent roof penetrations.

