The challenge
Two existing cycs were worn, tape and adhesive covered parts of the floor, InsulQuilt required repair, acoustic ceiling tiles were damaged, and selected Speed Rail needed removal.
The stage also needed Cat6a connectivity, stronger wireless coverage, and an updated bell-and-light system for modern live-streaming and stage operations. Upper walls, ceiling, and grid work required safe elevated access.

